Line 1 (Ürümqi Metro)
Appearance
![]() | You can help expand this article with text translated from the corresponding article in Chinese. (November 2022) Click [show] for important translation instructions.
|
Line 1 | |||
---|---|---|---|
![]() | |||
![]() Line 1 train leaving Balou station | |||
Overview | |||
Status | Operational | ||
Locale | Ürümqi, Xinjiang, China | ||
Termini | |||
Stations | 23 | ||
Service | |||
Type | Rapid transit | ||
System | Ürümqi Metro | ||
Operator(s) | Ürümqi Metro Group Corporation Ltd | ||
Rolling stock | 6-car Type A[1] | ||
History | |||
Opened | 25 October 2018 | ||
Technical | |||
Line length | 33.7 km (20.9 mi)[2] | ||
Number of tracks | 2 | ||
Character | Underground[3] | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
Operating speed | 80 km/h | ||
|
Line 1 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese name | |||||||||||
Simplified Chinese | 乌鲁木齐地铁1号线 | ||||||||||
Traditional Chinese | 烏魯木齊地鐵1號線 | ||||||||||
| |||||||||||
Uyghur name | |||||||||||
Uyghur | ئۈرۈمچى مېتروسى 1- لىنىيە | ||||||||||
|


Advertisement
Line 1 of the Ürümqi Metro is a subway line in Ürümqi.

Advertisement
The northern section from International Airport to Balou, was opened on 25 October 2018. The southern section from Balou to Santunbei opened on 28 June 2019.[1] In April a 6 km long section from International Airport to East International Airport started operation.

Advertisement
After the first two section opened Line 1 had a total length of 27.615 km[1] and 21 stations.[1][4] It is fully underground.[3]
History
[edit]Line 1 commenced construction in March 2014.[5] Tunneling works were completed in December 2017. The northern section of Line 1 (16.5 km[3]) opened on 25 October 2018. The southern section of Line 1 (11.1 km[3]) opened on 28 June 2019.[1]
Opening timeline
[edit]Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
International Airport — Balou | 25 October 2018 | 16.5 km (10.3 mi)[3] | 12 | Phase 1 (northern section) |
Balou — Santunbei | 28 June 2019 | 11.1 km (6.9 mi)[3] | 9 | Phase 1 (southern section) |
Stations
[edit]
Station name | Transfer | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | Uyghur | ||||
Santunbei | 三屯碑 | سەندۈڭبىي | 0.00 | 0.00 | Tianshan | |
Xinjiang University | 新疆大学 | شىنجاڭ داشۆ | 0.66 | 0.66 | ||
Erdaoqiao | 二道桥 | ئيرداۋ چىيا ۋ | 1.24 | 1.90 | ||
Nanmen | 南门 | نە نمين | 1.49 | 3.39 | ||
Beimen | 北门 | بېيمىن | 0.95 | 4.34 | ||
Xinxing Street | 新兴街 | شىنشىڭ كوچىسى | 1.29 | 5.63 | Shuimogou | |
Nanhu Square | 南湖广场 | نەنخۈ مەيدانى | 1.09 | 6.72 | ||
Nanhu North Road | 南湖北路 | شمالىي نەنخۈ | 1.27 | 7.99 | ||
Wangjialiang | 王家梁 | ۋاڭجيالياڭ | 1.15 | 9.14 | ||
Balou | 八楼 | بالۇ | 1.55 | 10.69 | Saybag/Xinshi | |
Xinjiang Library | 新疆图书馆 | شىنجاڭ كۈتۈپخانىس | 1.08 | 11.77 | Xinshi | |
Zhongyinggong | 中营工 | جوڭيىڭگوڭ | 0.90 | 12.67 | ||
Xiaoxigou | 小西沟 | شىاۋشىگۈ | 1.49 | 14.16 | ||
Tieluju | 铁路局 | تۆمۈريول ئىدارىسى | 1.22 | 15.38 | ||
Sports Center | 体育中心 | تەنتەربىيە مەركىزى | 1.23 | 16.61 | ||
Botanical Garden | 植物园 | ئۆسۈملۈكلەر باغچىسى | 1.18 | 17.79 | ||
Yingbin Road Crossing | 迎宾路口 | مەرھابا يولى ئېغىزى | 1.24 | 19.03 | ||
Sangong | 三工 | سەنگۇڭ | 1.35 | 20.38 | ||
Xuanrendun | 宣仁墩 | شۈەنرېندۈن | 1.21 | 21.59 | ||
Dadiwopu | 大地窝堡 | چوڭ دىئوپو | 2.70 | 24.29 | ||
International Airport | 国际机场 | خەلقئارا ئايروپورت | 2 (Airport MRT) | 2.96 | 27.25 | |
References
[edit]- ^ a b c d e 通南彻北展通途 乌鲁木齐地铁与您逐梦同行. mp.weixin.qq.com (in Chinese). 2019-06-27. Archived from the original on 2019-06-27.
- ^ "Ürümqi". Urbanrail. Retrieved 2025-04-18.
- ^ a b c d e f 28日,京疆合作的乌鲁木齐轨道交通1号线全线开通试运营. 北京市轨道交通建设管理有限公司 (in Chinese). 2019-09-03. Archived from the original on 2019-11-06.
- ^ 乌鲁木齐地铁1号线北段空载试运行. Kanzhun (in Chinese). 2018-04-18. Archived from the original on 2019-06-09.
- ^ 乌鲁木齐地铁1号线年底可全线试运营. news.sina.com.cn (in Chinese). Archived from the original on 2018-07-06. Retrieved 29 March 2018.